Repair of concrete and steel facilities in industry:
Rehabilitation of production plant 6- Factory for production of salt
 removal of damaged concrete
 hydrodynamic cleaning of columns, beams and slabs and removal of weak and degraded concrete
 sandblasting, removal of damaged reinforced steel and anti-corrosion protection
 repair of damaged concrete surface with repair mortars
 surface protection with polymer cement waterproofing compound.
Contracting authority: Solana d.d. Tuzla, Bosnia and Herzegovina, 2020.
Rehabilitation of hyperboloid cooling tower unit 2. Repair of reinforced concrete structure from inside and outside (40.000m²).
 removal of damaged concrete
 hydrodynamic cleaning of cleaning of concrete surface
 sandblasting, replacement od damaged and protection of reinforcement
 repair of damaged concrete surface with repair mortars
 surface protection with coatings.
Contracting authority: Elektrani na Severna Makedonija REK Bitola, 2019-2020.
Repair of water tower H=50m in City Gradiška
 hydrodynamic cleaning of the tower made of brick and reinforced concrete
 repair and protection of concrete and brick surface (reparation, cleaning from algae and moss, protection with coatings)
 sandblasting and anti corrosive protection of steel pipelines
 sandblasting and anti corrosive protection of steel construction inside of tower (stairs and platforms)
 anti-corrosive protection of steel tank water tower with coatings for drinking water.
Investor: Water supply company Gradiška, Bosna and Herzegovina, 2018.
Repair of water treatment facility on Power plant Ugljevik:
 hydrodynamic cleaning (water blasting) reinforced concrete surfaces on the inside and outside.
 repair of damaged concrete surface with cement and epoxy repair mortars
 injection of cracks with epoxy mass
 application on inside concrete surface layer of epoxy-cement mortar 
 installation of sealing strips on expansion joints
 protection of the inner concrete surface with epoxy, chemical resistant coating
 protection of the external concrete surface with coatings based on metal- acrylic resins
 protection of walkway with epoxy-cement mortar.
Contracting authority: Z.P. "Rudnik i Termoelektrana Ugljevik", Bosnia and Herzegovina, 2017.
Repair of natural cooling tower RT-1 H=62m in Power plant Tuzla:
 temporally pre-stressing, dismantling of old cables for pre-stressing and mounting of new cables with supporting elements (anchor blocks, guides)
 strengthening three horizontal rings with CFRP strips
 repair of concrete surface from inside and outside (joint plates, horizontal and inclined beams, triangular plates)
 sand blasting and anti-corrosion protection of the steel construction (handrail on top, ladders).
Contracting authority: Public enterprise "Elektroprivreda BiH", Power plant Tuzla, Bosnia and Herzegovina, 2017.
Rehabilitation of hyperboloid cooling tower unit 6-215MW. Repair of reinforced concrete structure (cc 34.000m²) from inside and outside. Replacement of lightning arresters – Contracting authority: Public enterprise ”Elektroprivreda BiH”, Power plant Tuzla, Bosnia and Herzegovina, 2012.