Our main activity is design and construction of industrial objects with ”turn-key” system as well as repair, reconstruction and maintenance of existing structures in all its segments.
Construction of reinforced concrete chimney H=62m by turnkey
system:
foundation
reinforced concrete
shell
production and
installation of flue pipes made from acid resistant steel
design and
installation of steel construction on object (ladders and
platforms)
lightning rod and
obstruction lights.
Contracting authority: KJKP Toplane Sarajevo, Bosnia and
Herzegovina, 2018.
Design of preliminary and main project of new reinforced concrete chimney with smoke pipes made of acid resistant material. Contracting authority: KJKP Toplane Sarajevo, Bosnia and Herzegovina, 2017.
Design of the main repair project of reinforced concrete chimney H=202m (brick and concrete) in Heating company TE-TO Zagreb. Contracting authority: Electric power industry of Croatia, TE-TO Zagreb, Croatia, 2016.
Design of main project of steel circular platforms and ladders on reinforced concrete chimney Sinter furnace 4 H=150m in factory AM Zenica Aglomeracija. Contracting authority: Steel industry Arcelor Mittal Zenica, Bosnia and Herzegovina, 2015.
Construction of main project updates (increase in height from 17.6 m to 23 m) of the Lundberg furnace chimney made of acid-resistant steel - Client: Natron-Hayat doo Maglaj, Bosnia and Herzegovina 2013.
Design of the project for reconstruction of AB chimney H = 100m block 6 in the thermal power plant "Kakanj" (expansion inlet flue, chimney reinforcement) - Client: Electric Power Industry of FBiH, TPP Kakanj, 2013.
Design and construction of reinforced concrete chimney h=31m, with three stacks made of acid-resistant steinless steel – Contracting authority: General hospital ”Prim.dr. Abdulah Nakaš” Sarajevo, Bosnia and Herzegovina, 2008.
Design, delivery, and installation of three multi-layer chimney made of acid-resistant steinless steel with inside diameter 800mm h=78m – Contracting authority: ”JKT Toplota Uzice i MPP Jedinstvo Uzice”, Serbia, 2008.
Construction of TV converter with antena tower in town Brcko – Contracting authority: RTV Federacije BiH d.o.o. Sarajevo, Bosnia and Herzegovina, 2008.
Removing old chimney, designing, manufacturing and instalation of new chimney. Material stainless steel, h=15m with diameter Ø400mm in heating boiler room ”Higijena” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 2008.
Removing old, design, manufacturing and instalation of new multiple layer steel chimney h=18,40 meter for tunnel kiln – Contracting authority: ”TONDACH” Djakovo, Croatia, 2007.
Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=32m in heating boiler room ”Cengic Vila” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 2000.
Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=64m in heating boiler room ”Blanke Blazek” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 1998.
Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=35m in heating boiler room ”Podvoznjak” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 1998.